Jinxi project included in the provincial "machine substitution" demonstration project
Release time:
2014-09-11
Jinxi project of pharmaceutical company successfully passed the on-site inspection of relevant leaders of Zhejiang Provincial Economic and Information Commission and Zhejiang Provincial Department of finance, and was selected into 100 demonstration projects of "machine substitution" in Zhejiang Province in 2014.
In order to implement the strategic deployment of "machine substitution" of Zhejiang provincial Party committee and government, the provincial economic and Information Commission decided to organize enterprises to apply for 100 demonstration projects of "machine substitution", It requires enterprises to select projects with industry or regional representation, obvious results and demonstration and promotion value around five forms of "machine substitution", automatic transformation of the whole production line, industrial robot of automatic production line, machine networking and factory networking.
The highlight of the "machine substitution" project of Jianfeng Pharmaceutical Jinxi lies in the introduction of the most advanced powder injection production linkage line from abroad, and other major production equipment adopts the products of the most advanced enterprises in China. The addition of automatic feeding and discharging system for vacuum freeze dryer has changed the original manual feeding and discharging operation mode, eliminated the pollution caused by personnel operation, and further strengthened the protection of product quality; the automatic control system of tank area/synthesis area is added, which realizes the automatic switching between the storage tanks. At the same time, nitrogen is used to protect the storage tanks, prevent the emission of volatile organic gases caused by air backflow, and effectively protect the environment from pollution. According to the temperature monitoring of the tank body, the temperature adjustment is automatically carried out to reduce the safety risk of hazardous chemicals storage. The real-time monitoring system of the environment is added to realize real-time monitoring of the production process environment, beyond the specified value, the system will give an alarm, etc. The effectiveness of "machine substitution" is mainly manifested in that the main production equipment has reached the advanced level of the industry, which effectively guarantees product quality and safe production, and the batch production capacity can be doubled; after the "machine substitution" is adopted in some links, the preparation production line is expected to reduce the number of operators. 30 people.
It is understood that the projects listed in the plan of 100 "machine replacement" demonstration projects in Zhejiang Province in 2014 will be given priority when arranging relevant special funds, and some projects will be selected as the province's "machine replacement" demonstration case.